The aspect worth notification is that the airport has successfully implemented the solar energy system by 2015. That allowed the airport to decrease the costs for energy, which, in turn, will positively affect its operating costs. To realize the project the collaboration of the County, Power Plant, and the Energy Trust was required, which turned out to be beneficial for all parties.

The airport has also presented an efficient Storm Water Permit-Prevention Plan that will ensure the safety of the terminal building and passengers in case of the natural disaster.

The terminal building is equipped with only one grooved asphalt runway 14/32 which is 8.800 meters long.